This will not work as the joist was not designed for this load originally.
Improper repair of floor joists.
Tack a beam under the sagging joists.
Finally if all else fails drop your pipes and ducts down below the joists and box them in with wood framed soffits.
Nailing two 2x4s together will work to span about three joists unless the sag is under a weight bearing wall.
The notch was made where the floor joist recessed into a wood beam supported by chimney corbeling.
Position bathroom vent fans so the ducts can run parallel to the joists right up to where they exit the house.
Jacking them up too fast may cause cracks in the walls and floors overhead.
Notches at the end of a joist should not exceed 1 4 of the joist depth.
Total costs will depend on the extent of the damage and the ease of access to the joists through a basement or crawlspace but in general sistering averages 100 300 or more per joist and could run 1 000 3 000 or more to repair a tilted wavy or bouncy floor under an average room.
Generally there should never be any cuts or penetrations in the middle third of any joist or anywhere along the bottom of the joist.
Use common sense when deciding how many fasteners to use.
Corbeling is an old school overlapping arrangement of bricks with each course extending farther out from the vertical of the wall than the course below.
However doing this does not fix the slant that the floor has taken since the old joists got damaged.
Make sure not to install joists so they run parallel to and directly under walls where you intend to install ductwork.
A day until they re level.
A common but improper repair by other contractors is to install more full length joists.
Floor is sinking between the floor joists.
Click the image to enlarge.
Improper holes and notches from alterations and running service lines are a major source of weakened joists.
Pictured is joist repair method for end rotted joist using plywood and some suggestions for best practice.
Repairing flooring vinyl wood or tile costs 347 on average or between 188 and 512 because pros need to go through this layer to get to the structural elements of subfloors and joists expect to pay far more for structural repairs.
Take some extra time and jack the damaged area up so that the new lumber doesn t need to be notched.
Splicing with plywood can have some advantages over splicing with a solid joist in many situations.