You ll learn what tools you.
Install engineered hardwood over concrete with underlayment.
Check the manufacturer s recommendations but in most cases it s a minimum of three days with no maximum.
Installing engineered hardwood flooring over concrete too tight against a stationary object will not allow room for normal expansion and may cause a failure.
For excellent flooring choices for moist wet areas see waterproof basement flooring best options.
You don t want the adhesive drying before you can get to that area.
This installation method is identical to staple down only the fastener and fastening tool differ.
How to install engineered wood over concrete engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
Next check the boards for warpage or defects and then remove any bad ones.
Follow these steps to install an engineered wood floor in your home.
When you float an engineered or laminate floor none of the boards are actually attached to the subfloor.
Watch as jack explains what s involved in floating installation of engineered hardwood flooring.
Your very first step before installing engineered hardwood floors over concrete is to let the boards acclimate to the room where they re going to be installed.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Only spread the adhesive over small areas ahead of you at any given time.
Underlayments pads are especially important for engineered floors or laminate floors which are installed via the floating method over wood or concrete subfloors.
And then use a hand stapler to attach to the subfloor.
Simply roll the black felt paper out over the plywood subfloor overlapping the seams approximately 4 to 6 in.
We should note too that if your basement is prone to flooding laminate is on the list of poor flooring choices that includes carpeting solid hardwood and engineered hardwood and we don t recommend that you attempt to install it over concrete.
Solid parquet should not be installed below grade.
Considering new hardwood floors.
Treated plywood to the concrete with concrete screws spaced every 16 in.