Start the installation at the longest unobstructed wall.
Installing hardwood floors when raining.
Between 5 and 10 days ahead of time check to see if the temperature and humidity of the space is at normal living conditions.
Remove the shoe molding and snap a chalk line 3 8 out from the baseboard this allows for expansion in the hot humid weather and contraction in the colder drier weather of the hardwood flooring.
Learn how to install solid hardwood flooring with a few simple tools.
Here s how to install flooring using the staple down method.
Hardwood floors are durable beautiful and a great diy project.
This means it must be stored in an area with similar conditions and allowed to either absorb or lose moisture to the surrounding air until it stabilizes.
As long as it acclimated to the house and the temp amd humidity of the house.
How to acclimate hardwood flooring.
Inside the boxes make sure the room or level where the flooring will be laid is an enclosed space.
Favorite answer no go ahead and install it as long as the laminate isn t wet.
Fall is a perfect season for hardwood flooring installation because the cool crisp weather exposes your hardwood flooring to less moisture.
You ll want to measure the hardwood floor moisture levels during at least four d ifferent points in the installation process.
Before a wood floor is installed the wood must be acclimated to the average temperature and humidity of the space where it will be installed.
Wed aug 04 2004 10 08 pm posts.
Note that this protocol should be followed year round not just during the summer when the humidity levels are high.
Any flooring questions you can e mail me.
Typically used for engineereed hardwood staple down installation works well with 3 8 5 8 inch flooring.
Next using your hammer insert a nail 1 inch from the wall and about every 4 inches along the board.