If you have a vinyl floor you may be able to install your flooring directly on top of it.
Installing laminate flooring on concrete floor.
Next use a back saw to cut the wooden door jamb by holding it perfectly level.
If your concrete passes the moisture test then plastic sheeting at least 6 mils thick will prevent moisture from getting into your laminate flooring.
A container for solution.
When installing a floating laminate floor you don t need to use any adhesive nails or staples.
This will help to acclimate the flooring to the room temperatures and humidity.
Work with great care otherwise you might scratch the jambs.
Place the laminate flooring on the concrete slab in the room where it is to be installed.
Laminate flooring is ready to install as long as the base floor is clean and smooth.
Next rotate down until the joints lock image 1.
Leave the flooring in the room for three days before installation.
To prepare the foundation concrete floor for laying laminate you will need.
To determine the roughness of the concrete floor we put a direct rail to the floor and a level is determined at any not very smooth place.
Multiply length times width of the room.
Where plastic sheets must be joined overlap the sheets by several inches and use strong vinyl tape to secure them.
For the next plank join the short end of the plank first image 2.
A plastic roller with spikes.
How to lay laminate flooring on concrete.
Slide the first two rows into their final position and repeat steps 5 and 6 above using the same alternating plank technique to complete the process.
After removing the existing flooring baseboards and quarter moulding check that the subfloor is solid flat and clean.
You will see a gap on the long side joints when the plank is rotated down.
Insert the tongue of the second row plank into the groove of the first row plank at a slight angle until the laminate edges meet.
Determine how much flooring and materials will be needed.
Remove any carpet or other flooring.
Add about 10 to that number to account for any possible mistakes and warped boards.